The $225 million Ross River Solar Farm faced severe ground instability due to flash flooding. Dura-Base mats provided a stable, temporary platform for piling works, ensuring the installation of 450,000 solar panels continued despite the wet conditions.

Temporary Platforms at Ross River Solar Farm

The Ross River Solar Farm development is a renewable energy project that will generate clean and sustainable electricity from the sun. Worth $225 million, the project is located in Townsville on a disused mango plantation. The farm comprises of 450,000 crystalline solar photovoltaic modules (solar panels) and are to be installed on ground-mounted frames that will track the movement of the sun. A key element of the project included using a fixed metal mounting structure that would be piled into the ground without the need for concrete. The solar farm is built on a 202 hectares site and will have enough capacity to generate 148 megawatts of clean renewable energy. The solar panels are enough to power 54,000 homes and the farm is anticipated to operate for 40 years after construction.

As the construction was underway, local storms burdened the delivery of the project. 350mm of rain fell causing flash flooding, thereby halting progress on the project. After the flood, the topsoil had dried, however, due to the rain, the underlying ground was still wet and unstable. Workers attempted to circumvent the issue by trimming the grass to allow the sun to dry the ground but to no avail.

Dura-Base Mats Protect the Ground for Piling Works

To remedy this problem, Dura-Base mats were used as a temporary platform for ground protection. Construction was done on the mats to construct the ground-mounted frames that were piled into the ground. Equally distributing the pressure on the ground, the mats prevented the machinery from sinking into the ground soft earth and causing damage to the vehicle. Furthermore, the mats could be leapfrogged over multiple areas of the site to be reused.

Results

Expecting to operate for another 40 years, the Ross River Solar Farm was a successful step towards green energy for the environment. The mats could be reused over multiple sections of the project site and were easily removed after construction was completed. Little remediation was required to the boggy ground and the utility-scale solar farm is set to provide clean energy to the locals of Townsville.

Project Details

Project Name Ross River Solar Farm
Industry
Location Townsville, QLD

Key Benefits

Resource Conservation

  • Mats leapfrogged and reused across site
  • No concrete piling platforms required
  • Minimal ground remediation needed

Emission Reduction

  • Enabled project to proceed without heavy delays
  • Reduced material transport for ground stabilisation

Minimised Time On Site

  • Rapid deployment restored site access
  • Easy removal after construction completion

Soil Conservation

  • Prevented machinery from damaging soft topsoil
  • Protected underlying ground structure
  • Little remediation required post-works

Start Your Project

See how our solutions can work for your next project.

Get a Quote

Gallery

Piling Rig Access Over Saturated Grounds With Crusty Surface
Aerial shot of Piling Rig Access Matting at Ross River Solar Farm
Ground shot of Solar Farm Piling Rig Access Matting

Piling Rig Access Over Saturated Grounds With Crusty Surface

Trusted by Industry Leaders

Proven Performance

JWA's composite matting solutions have been trusted by industry leaders across Australia for over a decade.